MEPCO New Connection Online Apply – Complete Guide March 2026

Getting a MEPCO new connection is now easier than ever. You no longer need to stand in long queues or visit offices repeatedly. With the help of online services, you can apply for a new electricity connection from your home.

The system introduced by Multan Electric Power Company allows users to submit applications, track status, and complete the process smoothly.

Before applying, you can also use our MEPCO Bill Online Check tool to understand billing structure and charges.

mepco-new-connection

What is MEPCO New Connection?

A MEPCO new connection is required when:

  • You are building a new house
  • You need a separate electricity meter
  • Your previous connection is disconnected

You can apply online or through the nearest MEPCO office.

How to Apply for MEPCO New Connection

Follow these simple steps:

✅ Step 1: Get Application Form

Download the new connection form from the official website of Multan Electric Power Company.


✅ Step 2: Fill the Form

Enter correct details such as:

  • Name & CNIC
  • Address
  • Load requirement
  • Contact details

✅ Step 3: Attach Required Documents

You need to upload/attach:

  • Copy of CNIC
  • Proof of ownership
  • NOC (if rented property)
  • Witness CNIC copies
  • Undertaking form
  • Previous bill copy (if applicable)

✅ Step 4: Submit Application

  • Submit form at nearest MEPCO office
  • OR apply online (if available)

After submission, you will receive:
✔ Receipt
✔ Tracking / Serial number


✅ Step 5: Verification & Demand Notice

  • MEPCO team will verify documents
  • Site inspection will be done
  • Demand notice will be issued

✅ Step 6: Payment & Installation

  • Pay demand notice fee via bank
  • Submit payment proof
  • Your electricity meter will be installed

Time Required for MEPCO New Connection

The processing time depends on connection type:

🔹 Category 1 (Up to 15 kW)

  • Estimated Time: ~30 Days

🔹 Category 2 (16–70 kW)

  • Estimated Time: ~44 Days

🔹 Category 3 (71–500 kW)

  • Estimated Time: ~73 Days

Complete Process Overview

  1. Application submission
  2. Site verification
  3. Cost estimation
  4. Demand notice issuance
  5. Payment submission
  6. Wiring test report
  7. Final approval
  8. Meter installation

👉 First check your bill:
MEPCO Bill Online Check by Reference Number

👉 Pay your bill easily:
MEPCO Bill Online Payment Methods

👉 Need duplicate bill:
Download Duplicate MEPCO Bill


🌐 Official Source

For official updates and application form, visit:
👉 Multan Electric Power Company


Important Instructions

  • Always provide correct information
  • Double-check your documents
  • Keep payment receipt safe
  • Do not attempt meter tampering (penalty applies)

MEPCO Meter Replacement

If your meter is faulty:

  • Submit complaint to MEPCO office
  • Do not attempt self-repair
  • MEPCO team will inspect and replace if needed

FAQs

How can I apply for MEPCO new connection?

You can apply by filling out the application form and submitting it with required documents to MEPCO office.

What documents are required for MEPCO new connection?

CNIC, ownership proof, NOC (if rented), witnesses CNIC, and application form.

How long does MEPCO connection take?

It usually takes 30 to 73 days depending on connection category.